• Town of Chapin 2.4 MGD WWTP, Chapin, SC

    A Creative Plant Conversion from 1.2 MGD to 2.4 MGD In 2015 plans to replace the insufficient lagoon system plant formally commenced and Hussey Gay Bell was engaged by the Town to plan, design and oversee construction for a new greenfield facility to double the plant’s capacity which will bring the treatment facility in line […]

  • Chesney Elementary Addition, Duluth, GA

    A 33,500 SF Addition for Generations of Learning Hussey Gay Bell was recently awarded its 33rd commission with Gwinnett County Public Schools (GCPS), a 22-classroom addition to Chesney Elementary School in Duluth, Georgia. The existing campus has already received one major addition and renovation with an additional expansion not anticipated. Our challenge includes placing a […]

  • Facilities at Interchange Court, Savannah, GA

    One-Stop, Multiple Resources For A Historic Community The scope of work consists of design consultant services for the relocation of several facilities to City-owned property at 14 Interchange Court in Savannah, Georgia. Hussey Gay Bell is providing architectural, interiors, structural, mechanical, electrical, plumbing and civil design services. Services include all aspects of site and architectural […]

  • SCCPSS Jenkins STEM High School, Savannah, GA

    A New Vision:  A STEM School Within A School Hussey Gay Bell was recently selected by the Savannah-Chatham County Public Schools Board of Education to design the District’s new Jenkins High School project which, through heavily phased construction, will replace the existing school located on a 40-acre site off of DeRenne Avenue. At completion, this […]

  • Apalachee High School Renovation, Winder, GA

    A 169,000 SF Phased Renovation For Barrow County Apalachee High School is Hussey Gay Bell’s first project with the Barrow County School System. This comprehensive renovation and modification will encompass 169,000 SF and include every component of the existing campus that will remain in operation during renovations. Phased over two summers, and continuing throughout the […]

  • Great Swamp Effluent Disposal Expansion, Beaufort, SC

    Great Swamp Effluent Disposal Expansion Hussey Gay Bell is providing engineering services in connection with Beaufort-Jasper Water & Sewer Authority (BJWSA)’s Great Swamp Effluent Disposal Expansion. This expansion project includes extension of a new effluent pipe from Highway 278 to a new distribution header for effluent disposal and a new boardwalk. The project scope includes […]

  • Chamblee Charter High School, Chamblee, GA

    Addition to Meet the Vision for the Future The Chamblee Charter High School current campus consist of one main building located on 20.71 acres at 3688 Chamblee-Dunwoody Road in Chamblee, Georgia. The original campus construction was completed in 2014, and there have been no additions. The current size is approximately 279,500 SF. The campus contains […]

  • GPA Colonel’s Island Bulk Facility, Brunswick, GA

    Facilities Grow As Import and Export Grow The project consists of the design services for the Colonel’s Island Bulk Facility development in the existing GPA Colonel’s Island Terminal in Brunswick, Georgia. This terminal contains two business operations, automobile processing and bulk handling, utilizing three separate marine berths along the Brunswick River. The bulk handling operations, […]




  
  • Apalachee High School Renovation, Winder, GA

    A 169,000 SF Phased Renovation For Barrow County Apalachee High School is Hussey Gay Bell’s first project with the Barrow County School System. This comprehensive renovation and modification will encompass 169,000 SF and include every component of the existing campus that will remain in operation during renovations. Phased over two summers, and continuing throughout the […]

  • SCCPSS Jenkins STEM High School, Savannah, GA

    A New Vision:  A STEM School Within A School Hussey Gay Bell was recently selected by the Savannah-Chatham County Public Schools Board of Education to design the District’s new Jenkins High School project which, through heavily phased construction, will replace the existing school located on a 40-acre site off of DeRenne Avenue. At completion, this […]

  • Chamblee Charter High School, Chamblee, GA

    Addition to Meet the Vision for the Future The Chamblee Charter High School current campus consist of one main building located on 20.71 acres at 3688 Chamblee-Dunwoody Road in Chamblee, Georgia. The original campus construction was completed in 2014, and there have been no additions. The current size is approximately 279,500 SF. The campus contains […]

  • Town of Chapin 2.4 MGD WWTP, Chapin, SC

    A Creative Plant Conversion from 1.2 MGD to 2.4 MGD In 2015 plans to replace the insufficient lagoon system plant formally commenced and Hussey Gay Bell was engaged by the Town to plan, design and oversee construction for a new greenfield facility to double the plant’s capacity which will bring the treatment facility in line […]

  • GPA Colonel’s Island Bulk Facility, Brunswick, GA

    Facilities Grow As Import and Export Grow The project consists of the design services for the Colonel’s Island Bulk Facility development in the existing GPA Colonel’s Island Terminal in Brunswick, Georgia. This terminal contains two business operations, automobile processing and bulk handling, utilizing three separate marine berths along the Brunswick River. The bulk handling operations, […]

  • Great Swamp Effluent Disposal Expansion, Beaufort, SC

    Great Swamp Effluent Disposal Expansion Hussey Gay Bell is providing engineering services in connection with Beaufort-Jasper Water & Sewer Authority (BJWSA)’s Great Swamp Effluent Disposal Expansion. This expansion project includes extension of a new effluent pipe from Highway 278 to a new distribution header for effluent disposal and a new boardwalk. The project scope includes […]

  • Chesney Elementary Addition, Duluth, GA

    A 33,500 SF Addition for Generations of Learning Hussey Gay Bell was recently awarded its 33rd commission with Gwinnett County Public Schools (GCPS), a 22-classroom addition to Chesney Elementary School in Duluth, Georgia. The existing campus has already received one major addition and renovation with an additional expansion not anticipated. Our challenge includes placing a […]

  • Facilities at Interchange Court, Savannah, GA

    One-Stop, Multiple Resources For A Historic Community The scope of work consists of design consultant services for the relocation of several facilities to City-owned property at 14 Interchange Court in Savannah, Georgia. Hussey Gay Bell is providing architectural, interiors, structural, mechanical, electrical, plumbing and civil design services. Services include all aspects of site and architectural […]