• West Ashley Transmission, Charleston, SC

    Subaqueous Drilling in the Charleston Peninsula Slated for completion in late 2018, the project scope generally consists of the design and construction of a water transmission main between North Charleston and West of the Ashley River. The project replaces a 24-inch waterline that was taken out of service approximately a decade ago due to persistent […]

  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • City of Jesup 2.5 MGD WWTP, Jesup, GA

    Jesup Embarks On Journey To New 2.5 MGD Wastewater Treatment Plant Hussey Gay Bell served as the Lead Engineer for the City’s new 2.5 MGD extended aeration activated sludge wastewater treatment plant facility, responsible for providing full design and construction phase services for the project which was constructed by Savannah-based, BRW Construction. The Jesup Wastewater […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]

  • Service Area Water & Sewer, Pooler and Savannah, GA

    Over 150 Infrastructure Projects, Decades of Service Since the 1960s, Hussey Gay Bell’s engineering team has master planned and designed over 150 infrastructure projects for the City ranging from new location water and sewer system extensions and rehab for water, sewer and drainage, wastewater treatment plant new construction and upgrades, as well as reclaimed water […]

  • South Bryan County WWTP, Bryan County, GA

    Upgrade South Bryan County 0.2 MGD Wastewater Treatment Plant This project consists of a new 1.0 MGD flat plate Ovivo Kubota MBR plant.  A competitive bid of various flat plate and hollow fiber membrane manufacturers was completed to determine the select vendor for design.  This facility is equipped with 0.5 MGD of membranes and is […]

  • Bolivar WWTP Improvements, Bolivar, TN

    Bolivar’s 1.4 MGD Plant Receives An Upgrade Scope of work consisted of the preparation of environmental, preliminary and final engineering reports, construction administration, construction observation and project close-out for the installation of approximately 11,000 linear feet of 14-inch force main, upgrading an existing pump station, aeration equipment, yard piping and structures, settling basins, flow measurement […]

  • East Cooper Water Supply No. 2, Charleston, SC

    60,000 Residents Receive Drinking Water, Fire Protection An ACEC-SC-award winning project, this project reached final completion in 2007. Hussey Gay Bell played a crucial role in the success of Charleston Water System’s East Cooper Water Supply #2 project. Had this project not been completed, it would have resulted in a limited water supply for consumption […]

  • Wastewater Collection System Improv, Centerville, TN

    Over 106,410 Linear Feet of Improvements Phase I of this project consisted of the preparation of environmental, preliminary and final engineering reports, design, construction administration and resident inspection for the construction of approximately 460 linear feet of 16-inch steel casing pipe; 33,000 linear feet of 8-inch ductile iron pipe gravity sewer line; 5,500 linear feet […]

  • Stono River 24” Water Main, Charleston, SC

    An Emergency Water Main Replacement In A Coastal Setting In 2006, Charleston Water Systems (CWS)’s 24” water main that crosses the Stono River and runs parallel to Maybank Highway was seriously damaged by a barge anchor. At the time, the pipeline was one of two supplying potable water to John’s Island and Kiawah/Seabrook Islands. CWS […]

  • Bacon Park Reuse Main Improvements, Savannah, GA

    Drilling 5 Miles of Pipe In The Name of Reuse This project consists of a new 16-inch diameter reuse water main from the President Street Water Reclamation Facility to the Bacon Park Golf Course and improvements to the reuse water pumping facilities at the President Street facility. The proposed reuse water main is approximately 29,000 […]

  • Master Plan & Contingency Plan, Charleston, SC

    A Sewer Tunnel System Replacement & Contingency Plan As a result of the STAG monies obtained through the Corps of Engineers, Hussey Gay Bell and Black & Veatch teamed to produce a Master Plan for the replacement of Charleston Water System’s failing sewer tunnel system. Hussey Gay Bell’s task also included the preparation of a […]

  • East Rocky Branch Sewer Improvements, Columbia, SC

    Replacing Large Diameter Pipe In An Urban Setting Project scope consists of the replacement of the sanitary sewer piping to upsize the existing piping from Manhole SS-RB05-05541-MH to Manhole SS-RB05-14373-MH for a distance of approximately 4,700 LF with new 36-inch diameter gravity sewer located along Rocky Branch. Phase II also includes the replacement of sanitary […]

  • Lady’s Island Force Main Diversion, Beaufort, SC

    An Alternative Sewer System Beaufort-Jasper Water & Sewer Authority (BJWSA) selected Hussey Gay Bell to provide professional engineering services to design the implementation of an alternative sewer system, which will divert the Authority’s sewer flows generated by the Lady’s Island sewer system from BJWSA’s St. Helena Wastewater Treatment Plant to the Port Royal Island Wastewater […]

  • Crossroads 3.0 MGD WQCP, Savannah, GA

    Activated Sludge Treatment Facility Provisioned For Future Build-Out Phase I of the project consisted of designing a new 3.0 MGD activated sludge wastewater treatment facility including influent screens, grit removal, equalization, aeration basins, secondary clarifiers, effluent disk filters and UV disinfection. The plant is also equipped with aerobic digestion, belt filter press and truck loading […]

  • Pooler Wastewater Treatment Plant & Upgrade, Pooler, GA

    From 2.5 MGD to 3.3 MGD, Pooler Continues Path Of Innovation In Treatment The first phase of this project consisted of a new 2.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plant constructed on a very small tract of land next to an existing 0.98 MGD aerated lagoon facility. Effluent from this facility is […]

  • Town of Chapin 2.4 MGD WWTP, Chapin, SC

    A Creative Plant Conversion from 1.2 MGD to 2.4 MGD In 2015 plans to replace the insufficient lagoon system plant formally commenced and Hussey Gay Bell was engaged by the Town to plan, design and oversee construction for a new greenfield facility to double the plant’s capacity which will bring the treatment facility in line […]

  • Port Access Road Utility Coordination, Charleston, SC

    Utility Relocation for Planned Roadway Improvements This $225M project includes relocation of water utilities that are in conflict with the planned roadway improvements associated with the new Port Access Road, which will provide access from the proposed marine terminal to I-26 while maintaining service for commuters. The project will be completed independently by a Charleston […]

  • Earlewood Water System Improv, Columbia, SC

    Improved Water Quality for a Historic Neighborhood Hussey Gay Bell designed one of the City’s top water quality projects to improve the aging water distribution systems in the historic Earlewood neighborhood which seeks to provide high-quality water for its over 2,000 residents, reduce the number of water main repairs, and increase the available fire protection […]

  • Dean Forest Road 24” Main, Savannah, GA

    Connecting Savannah, Pooler and Garden City Through Water Service The existing water main follows the Dean Forest Road corridor of the City of Savannah, with property on either side existing within the City of Pooler and Garden City. As a result, the City had no water service paying customers along the existing route. The impetus […]

  • Bluffton Area Sewer Master Plan, Town of Bluffton, SC

    Joint Venture & Phased Approach Hussey Gay Bell’s project scope consisted of the development of a master plan to determine the most economical way to extend Beaufort-Jasper Water & Sewer Authority (BJWSA) sewer service to an annexed 624-acre area about 1.6 miles northwest of the Town of Bluffton. The proposed gravity sewers, two new lift […]

  • Broad Creek WWTP, Hilton Head Island, SC

    Innovative Approach To Wastewater Treatment And Effluent Discharge Design Project scope consisted of the design and construction of a 2.1 MGD activated sludge plant incorporating total reuse of liquid and solid produced at plant. Liquid used for irrigation of three (3) golf courses. Solids were used to produce compost, which was given to residents for […]

  • Garden City Annexation, Garden City, GA

    Water & Sewer Master Planning for a Municipality Garden City was one of Hussey Gay Bell’s first clients, beginning in 1958. Since that time, Hussey Gay Bell has continued to provide services as one of their long-term engineering consultants. Hussey Gay Bell has handled their infrastructure master planning and design including wastewater treatment, sewage collection, […]

  • Great Swamp Effluent Disposal Expansion, Beaufort, SC

    Great Swamp Effluent Disposal Expansion Hussey Gay Bell is providing engineering services in connection with Beaufort-Jasper Water & Sewer Authority (BJWSA)’s Great Swamp Effluent Disposal Expansion. This expansion project includes extension of a new effluent pipe from Highway 278 to a new distribution header for effluent disposal and a new boardwalk. The project scope includes […]

  • Statesboro WWTP, Statesboro, GA

    Statesboro Wastewater Treatment Plant Expansion To respond to the population growth in the area and the presence of infiltration flow which was not cost effective to remove, Hussey Gay Bell designed the expansion of the plant from 1.5 MGD to 10 MGD. The original treatment plant was a single, low rate trickling filter plant with […]

  • Church, Tradd, Queen & Legare, Charleston, SC

    An Upgrade for 1800s Water Mains In 2013, Hussey Gay Bell’s professional design staff reached final completion on the construction phase of this project which consisted of the replacement of potable water mains constructed in the late 1800s in the Charleston Historic District along Church, Tradd, Queen and Legare Streets in downtown Charleston, South Carolina. […]

  • Crossroads Force Main & Pump Station Improv, Savannah, GA

    From Master Plan to Implementation In 2003, Hussey Gay Bell developed the original pump station master plan for the Crossroads WRF service area. In 2015, Hussey Gay Bell completed the Crossroads Force Main & Pump Station Improvement project for the City of Savannah. This project consisted of the design of upgrades to two lift stations, […]

  • President Street WRF, Savannah, GA

    50 Years of Planning for Savannah’s Treatment Shift to Biosolids In the 1970s, Hussey Gay Bell, in association with Wiedeman & Singleton, designed the original secondary activated sludge wastewater treatment facility on President Street, which serves major ports of the City of Savannah and discharges effluent to the Savannah River with sludge disposal by incineration. […]

  • 2025 Water & Sewer Master Plan, Bryan County, GA

    Future Growth and Development for Bryan County In 2005, Hussey Gay Bell assisted Bryan County with the development of this water and sewer master plan as a planning tool for infrastructure required to meet the 2025 potable water and sanitary sewer demands of the County, which currently has little to no infrastructure. The study defined […]

  • Sylvania WWTP Improvements, Sylvania, GA

    Sylvania Wastewater Treatment Plant Improvements The project consisted of the demolition and replacement of six (6) surface aerators in the aerator basins, modification of aeration basin influent and return sludge piping, demolition and replacement of mechanical equipment in the existing concrete tanks of two clarifiers, construction of one new concrete clarifier, installation of one new […]

  • Key Slot, Godley Station & Towne Lake, Pooler, GA

    A Phased Approach to Planning Growth This project consisted of the design and installation of approximately 5,400 LF of 12-inch diameter C-900 PVC force main. The project included pump station upgrades at Key Slot which comprised of the replacement of existing submersible pumps, including pipe connection modifications; replacement of existing check and plug valves and […]

  • Lift Station 4048 Force Main Re-Route, Brunswick, GA

    A Coastal, Residential Extension of Service Hussey Gay Bell was contracted by Brunswick-Glynn County Joint Water & Sewer Commission (BGJWSC) to design approximately 3,100 LF of 24-inch force main to replace an existing 14-inch force main. The force main provides additional sewer capacity to the BGJWSC’s Lift Station 4005 by eliminating the re-pumping of sewer […]

  • 2004 Master Plan & 2013 Update, Pooler, GA

    Water & Sewer Master Plan & Update for Pooler Since 1963, Hussey Gay Bell has been Pooler’s primary consultant for engineering and surveying services. Hussey Gay Bell has served Pooler by performing design of water, sewer and drainage system improvements; assisting with City ordinances and master specifications; securing state and federal (GEFA) funding for their […]

  • Water & Sewer Master Plans, Statesboro, GA

    Nearly 35 Years of Service & Infrastructure The City of Statesboro has been a client of Hussey Gay Bell’s for nearly 35 years. During that period, Hussey Gay Bell has designed over 150 infrastructure projects for the City ranging from new location water and system to system extensions and rehab for water, sewer and drainage, […]

  • BJWSA Water & Sewer Master Plan, Jasper County, SC

    Two Alternatives for Future Development The purpose of this document was to provide a master plan for a water distribution system to serve the potential developments outlined in the Land Use Study of South Jasper County. This Master Plan evaluates two alternatives for source water to South Jasper County; additional groundwater wells or master metered […]

  • Reclaimed Water System Master Plan, Statesboro, GA

    Reuse Water System for a University & Municipality This project consisted of Hussey Gay Bell developing a master plan for the extension of utility services to the new southwest campus area. This master plan included an evaluation of reuse water for irrigation areas and the existing and proposed application rates by Georgia Southern University. This […]

  • West Ashley Sewer Tunnel, Charleston, SC

    120’ Below Earth’s Surface:  A Journey to Fix Charleston’s Deep Tunnel System From 2002 to 2008, Hussey Gay Bell was involved in Phases II-IV leading up to the Phase V West Ashley Sewer Tunnel & Influent Pump Station.  Phase II consisted of the design and construction of the $38.9 million Ashley Tunnel; Phase III consisted […]

  • Pooler Reuse Water Distribution, Pooler, GA

    Large-Scale Infrastructure for Pooler The Pooler Reuse Water Distribution System Upgrades consisted of two extensions to the City of Pooler’s reuse water distribution system to provide reclaimed water to the City’s recreation park and the Nordic Cold Storage facility. The first project modified the existing reuse water force main at the City’s wastewater treatment plant […]

  • Crossroads WQCP Service Area, Savannah, GA

    Master Plan & Provisions for Future Growth This project consisted of the master plan for the Crossroads WQCP service area in anticipation of diverting flow to the new 3.0 MGD wastewater treatment plant (including 6.0 MGD build-out flows). The master plan included build-out flow projections, locating master pump stations and utilization of hydraulic modeling for […]

  • St. Simons Island WWTP, St. Simons Island, GA

    St. Simons Island Wastewater Treatment Plant Upgrade The Design Build Team of Winter Construction and Hussey Gay Bell completed the treatment alternative evaluation, permitting, design and upgrade of the St. Simons, Georgia Wastewater Treatment Plant from 3 MGD to 4 MGD accomplishing startup of the upgrade within 24 months. Delays associated with permitting were minimized […]




  
  • President Street WRF, Savannah, GA

    50 Years of Planning for Savannah’s Treatment Shift to Biosolids In the 1970s, Hussey Gay Bell, in association with Wiedeman & Singleton, designed the original secondary activated sludge wastewater treatment facility on President Street, which serves major ports of the City of Savannah and discharges effluent to the Savannah River with sludge disposal by incineration. […]

  • Earlewood Water System Improv, Columbia, SC

    Improved Water Quality for a Historic Neighborhood Hussey Gay Bell designed one of the City’s top water quality projects to improve the aging water distribution systems in the historic Earlewood neighborhood which seeks to provide high-quality water for its over 2,000 residents, reduce the number of water main repairs, and increase the available fire protection […]

  • Lift Station 4048 Force Main Re-Route, Brunswick, GA

    A Coastal, Residential Extension of Service Hussey Gay Bell was contracted by Brunswick-Glynn County Joint Water & Sewer Commission (BGJWSC) to design approximately 3,100 LF of 24-inch force main to replace an existing 14-inch force main. The force main provides additional sewer capacity to the BGJWSC’s Lift Station 4005 by eliminating the re-pumping of sewer […]

  • Crossroads Force Main & Pump Station Improv, Savannah, GA

    From Master Plan to Implementation In 2003, Hussey Gay Bell developed the original pump station master plan for the Crossroads WRF service area. In 2015, Hussey Gay Bell completed the Crossroads Force Main & Pump Station Improvement project for the City of Savannah. This project consisted of the design of upgrades to two lift stations, […]

  • Town of Chapin 2.4 MGD WWTP, Chapin, SC

    A Creative Plant Conversion from 1.2 MGD to 2.4 MGD In 2015 plans to replace the insufficient lagoon system plant formally commenced and Hussey Gay Bell was engaged by the Town to plan, design and oversee construction for a new greenfield facility to double the plant’s capacity which will bring the treatment facility in line […]

  • West Ashley Transmission, Charleston, SC

    Subaqueous Drilling in the Charleston Peninsula Slated for completion in late 2018, the project scope generally consists of the design and construction of a water transmission main between North Charleston and West of the Ashley River. The project replaces a 24-inch waterline that was taken out of service approximately a decade ago due to persistent […]

  • Stono River 24” Water Main, Charleston, SC

    An Emergency Water Main Replacement In A Coastal Setting In 2006, Charleston Water Systems (CWS)’s 24” water main that crosses the Stono River and runs parallel to Maybank Highway was seriously damaged by a barge anchor. At the time, the pipeline was one of two supplying potable water to John’s Island and Kiawah/Seabrook Islands. CWS […]

  • Port Access Road Utility Coordination, Charleston, SC

    Utility Relocation for Planned Roadway Improvements This $225M project includes relocation of water utilities that are in conflict with the planned roadway improvements associated with the new Port Access Road, which will provide access from the proposed marine terminal to I-26 while maintaining service for commuters. The project will be completed independently by a Charleston […]

  • 2004 Master Plan & 2013 Update, Pooler, GA

    Water & Sewer Master Plan & Update for Pooler Since 1963, Hussey Gay Bell has been Pooler’s primary consultant for engineering and surveying services. Hussey Gay Bell has served Pooler by performing design of water, sewer and drainage system improvements; assisting with City ordinances and master specifications; securing state and federal (GEFA) funding for their […]

  • Garden City Annexation, Garden City, GA

    Water & Sewer Master Planning for a Municipality Garden City was one of Hussey Gay Bell’s first clients, beginning in 1958. Since that time, Hussey Gay Bell has continued to provide services as one of their long-term engineering consultants. Hussey Gay Bell has handled their infrastructure master planning and design including wastewater treatment, sewage collection, […]

  • Secession Effluent Force Main, Beaufort, SC

    A World Record Is Set Under Navigable Waters From 2006-2007, Hussey Gay Bell provided professional services to Beaufort-Jasper Water & Sewer Authority (BJWSA) for complete engineering design of 5,000 LF of fused 10-inch PVC DR 14 effluent force main installed using horizontal directional drilling; 3,000 LF of 10-inch PVC effluent force main installed using direct […]

  • Service Area Water & Sewer, Pooler and Savannah, GA

    Over 150 Infrastructure Projects, Decades of Service Since the 1960s, Hussey Gay Bell’s engineering team has master planned and designed over 150 infrastructure projects for the City ranging from new location water and sewer system extensions and rehab for water, sewer and drainage, wastewater treatment plant new construction and upgrades, as well as reclaimed water […]

  • Wastewater Collection System Improv, Centerville, TN

    Over 106,410 Linear Feet of Improvements Phase I of this project consisted of the preparation of environmental, preliminary and final engineering reports, design, construction administration and resident inspection for the construction of approximately 460 linear feet of 16-inch steel casing pipe; 33,000 linear feet of 8-inch ductile iron pipe gravity sewer line; 5,500 linear feet […]

  • Sylvania WWTP Improvements, Sylvania, GA

    Sylvania Wastewater Treatment Plant Improvements The project consisted of the demolition and replacement of six (6) surface aerators in the aerator basins, modification of aeration basin influent and return sludge piping, demolition and replacement of mechanical equipment in the existing concrete tanks of two clarifiers, construction of one new concrete clarifier, installation of one new […]

  • Bacon Park Reuse Main Improvements, Savannah, GA

    Drilling 5 Miles of Pipe In The Name of Reuse This project consists of a new 16-inch diameter reuse water main from the President Street Water Reclamation Facility to the Bacon Park Golf Course and improvements to the reuse water pumping facilities at the President Street facility. The proposed reuse water main is approximately 29,000 […]

  • Bolivar WWTP Improvements, Bolivar, TN

    Bolivar’s 1.4 MGD Plant Receives An Upgrade Scope of work consisted of the preparation of environmental, preliminary and final engineering reports, construction administration, construction observation and project close-out for the installation of approximately 11,000 linear feet of 14-inch force main, upgrading an existing pump station, aeration equipment, yard piping and structures, settling basins, flow measurement […]

  • 2025 Water & Sewer Master Plan, Bryan County, GA

    Future Growth and Development for Bryan County In 2005, Hussey Gay Bell assisted Bryan County with the development of this water and sewer master plan as a planning tool for infrastructure required to meet the 2025 potable water and sanitary sewer demands of the County, which currently has little to no infrastructure. The study defined […]

  • Statesboro WWTP, Statesboro, GA

    Statesboro Wastewater Treatment Plant Expansion To respond to the population growth in the area and the presence of infiltration flow which was not cost effective to remove, Hussey Gay Bell designed the expansion of the plant from 1.5 MGD to 10 MGD. The original treatment plant was a single, low rate trickling filter plant with […]

  • East Rocky Branch Sewer Improvements, Columbia, SC

    Replacing Large Diameter Pipe In An Urban Setting Project scope consists of the replacement of the sanitary sewer piping to upsize the existing piping from Manhole SS-RB05-05541-MH to Manhole SS-RB05-14373-MH for a distance of approximately 4,700 LF with new 36-inch diameter gravity sewer located along Rocky Branch. Phase II also includes the replacement of sanitary […]

  • Key Slot, Godley Station & Towne Lake, Pooler, GA

    A Phased Approach to Planning Growth This project consisted of the design and installation of approximately 5,400 LF of 12-inch diameter C-900 PVC force main. The project included pump station upgrades at Key Slot which comprised of the replacement of existing submersible pumps, including pipe connection modifications; replacement of existing check and plug valves and […]

  • West Ashley Sewer Tunnel, Charleston, SC

    120’ Below Earth’s Surface:  A Journey to Fix Charleston’s Deep Tunnel System From 2002 to 2008, Hussey Gay Bell was involved in Phases II-IV leading up to the Phase V West Ashley Sewer Tunnel & Influent Pump Station.  Phase II consisted of the design and construction of the $38.9 million Ashley Tunnel; Phase III consisted […]

  • Pooler Reuse Water Distribution, Pooler, GA

    Large-Scale Infrastructure for Pooler The Pooler Reuse Water Distribution System Upgrades consisted of two extensions to the City of Pooler’s reuse water distribution system to provide reclaimed water to the City’s recreation park and the Nordic Cold Storage facility. The first project modified the existing reuse water force main at the City’s wastewater treatment plant […]

  • Broad Creek WWTP, Hilton Head Island, SC

    Innovative Approach To Wastewater Treatment And Effluent Discharge Design Project scope consisted of the design and construction of a 2.1 MGD activated sludge plant incorporating total reuse of liquid and solid produced at plant. Liquid used for irrigation of three (3) golf courses. Solids were used to produce compost, which was given to residents for […]

  • Pooler Wastewater Treatment Plant & Upgrade, Pooler, GA

    From 2.5 MGD to 3.3 MGD, Pooler Continues Path Of Innovation In Treatment The first phase of this project consisted of a new 2.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plant constructed on a very small tract of land next to an existing 0.98 MGD aerated lagoon facility. Effluent from this facility is […]

  • 0.5 MGD Fripp Island WWTP, Fripp Island, SC

    A wastewater treatment plant on a sensitive natural tract This project consisted of a new 0.5 MGD hollow fiber (GE ZeeWeed) membrane bioreactor (MBR) plan constructed on a very sensitive tract of unused land surrounded by a golf course and residential properties.  This site required construction on an extremely small footprint and continued operation of […]

  • Reclaimed Water System Master Plan, Statesboro, GA

    Reuse Water System for a University & Municipality This project consisted of Hussey Gay Bell developing a master plan for the extension of utility services to the new southwest campus area. This master plan included an evaluation of reuse water for irrigation areas and the existing and proposed application rates by Georgia Southern University. This […]

  • Church, Tradd, Queen & Legare, Charleston, SC

    An Upgrade for 1800s Water Mains In 2013, Hussey Gay Bell’s professional design staff reached final completion on the construction phase of this project which consisted of the replacement of potable water mains constructed in the late 1800s in the Charleston Historic District along Church, Tradd, Queen and Legare Streets in downtown Charleston, South Carolina. […]

  • Bluffton Area Sewer Master Plan, Town of Bluffton, SC

    Joint Venture & Phased Approach Hussey Gay Bell’s project scope consisted of the development of a master plan to determine the most economical way to extend Beaufort-Jasper Water & Sewer Authority (BJWSA) sewer service to an annexed 624-acre area about 1.6 miles northwest of the Town of Bluffton. The proposed gravity sewers, two new lift […]

  • Great Swamp Effluent Disposal Expansion, Beaufort, SC

    Great Swamp Effluent Disposal Expansion Hussey Gay Bell is providing engineering services in connection with Beaufort-Jasper Water & Sewer Authority (BJWSA)’s Great Swamp Effluent Disposal Expansion. This expansion project includes extension of a new effluent pipe from Highway 278 to a new distribution header for effluent disposal and a new boardwalk. The project scope includes […]

  • BJWSA Water & Sewer Master Plan, Jasper County, SC

    Two Alternatives for Future Development The purpose of this document was to provide a master plan for a water distribution system to serve the potential developments outlined in the Land Use Study of South Jasper County. This Master Plan evaluates two alternatives for source water to South Jasper County; additional groundwater wells or master metered […]

  • Lady’s Island Force Main Diversion, Beaufort, SC

    An Alternative Sewer System Beaufort-Jasper Water & Sewer Authority (BJWSA) selected Hussey Gay Bell to provide professional engineering services to design the implementation of an alternative sewer system, which will divert the Authority’s sewer flows generated by the Lady’s Island sewer system from BJWSA’s St. Helena Wastewater Treatment Plant to the Port Royal Island Wastewater […]

  • Crossroads 3.0 MGD WQCP, Savannah, GA

    Activated Sludge Treatment Facility Provisioned For Future Build-Out Phase I of the project consisted of designing a new 3.0 MGD activated sludge wastewater treatment facility including influent screens, grit removal, equalization, aeration basins, secondary clarifiers, effluent disk filters and UV disinfection. The plant is also equipped with aerobic digestion, belt filter press and truck loading […]

  • St. Simons Island WWTP, St. Simons Island, GA

    St. Simons Island Wastewater Treatment Plant Upgrade The Design Build Team of Winter Construction and Hussey Gay Bell completed the treatment alternative evaluation, permitting, design and upgrade of the St. Simons, Georgia Wastewater Treatment Plant from 3 MGD to 4 MGD accomplishing startup of the upgrade within 24 months. Delays associated with permitting were minimized […]

  • South Bryan County WWTP, Bryan County, GA

    Upgrade South Bryan County 0.2 MGD Wastewater Treatment Plant This project consists of a new 1.0 MGD flat plate Ovivo Kubota MBR plant.  A competitive bid of various flat plate and hollow fiber membrane manufacturers was completed to determine the select vendor for design.  This facility is equipped with 0.5 MGD of membranes and is […]

  • Master Plan & Contingency Plan, Charleston, SC

    A Sewer Tunnel System Replacement & Contingency Plan As a result of the STAG monies obtained through the Corps of Engineers, Hussey Gay Bell and Black & Veatch teamed to produce a Master Plan for the replacement of Charleston Water System’s failing sewer tunnel system. Hussey Gay Bell’s task also included the preparation of a […]

  • Dean Forest Road 24” Main, Savannah, GA

    Connecting Savannah, Pooler and Garden City Through Water Service The existing water main follows the Dean Forest Road corridor of the City of Savannah, with property on either side existing within the City of Pooler and Garden City. As a result, the City had no water service paying customers along the existing route. The impetus […]

  • Water & Sewer Master Plans, Statesboro, GA

    Nearly 35 Years of Service & Infrastructure The City of Statesboro has been a client of Hussey Gay Bell’s for nearly 35 years. During that period, Hussey Gay Bell has designed over 150 infrastructure projects for the City ranging from new location water and system to system extensions and rehab for water, sewer and drainage, […]

  • City of Jesup 2.5 MGD WWTP, Jesup, GA

    Jesup Embarks On Journey To New 2.5 MGD Wastewater Treatment Plant Hussey Gay Bell served as the Lead Engineer for the City’s new 2.5 MGD extended aeration activated sludge wastewater treatment plant facility, responsible for providing full design and construction phase services for the project which was constructed by Savannah-based, BRW Construction. The Jesup Wastewater […]

  • East Cooper Water Supply No. 2, Charleston, SC

    60,000 Residents Receive Drinking Water, Fire Protection An ACEC-SC-award winning project, this project reached final completion in 2007. Hussey Gay Bell played a crucial role in the success of Charleston Water System’s East Cooper Water Supply #2 project. Had this project not been completed, it would have resulted in a limited water supply for consumption […]

  • Crossroads WQCP Service Area, Savannah, GA

    Master Plan & Provisions for Future Growth This project consisted of the master plan for the Crossroads WQCP service area in anticipation of diverting flow to the new 3.0 MGD wastewater treatment plant (including 6.0 MGD build-out flows). The master plan included build-out flow projections, locating master pump stations and utilization of hydraulic modeling for […]